Trawsfynydd

BSPSPENNGET132 kV

Location

Loading map...
Coordinates

52.927100, -3.946280

From DNO data
Get Directions

Site Summary

Voltage Levels

2

Best Gen RAG
unknown
Best Gen Headroom

N/A

Best Demand Headroom

N/A

Operators

NGET, SPEN

Generation Connection Queue

Embedded Capacity Register + NESO TEC
██ MW
Queued
██ MW
Connected
10
Projects
Unlock the full 10-project queue with a premium subscription

Planned Reinforcement

DNO Network Development Reports
Total uplift
2027
First completion
1
Schemes
SchemeDriverUpliftIn service
Replacement of bulk oil circuit breakersModernisation2027

Voltage Levels (2)

132kV

2 busbars
TrawsfynyddNGET
transmission
Gen Headroom

N/A

Demand Headroom

N/A

Fault Level (3ph)

██.█kA

min: 19.6 kA

Firm Capacity

N/A

Trawsfynydd 132 kVSPENunknown
distribution
Gen Headroom

N/A

Demand Headroom

N/A

Fault Level (3ph)

██.█kA

Firm Capacity

N/A

Data Source

Distribution Operator:SP Energy Networks
License:OGL v3
Transmission Owner:National Grid Electricity Transmission
License:NESO Open Data Licence (OGL v3.0 based)

Data sourced from publicly available DNO and TSO datasets. Indicative — verify directly with the operators before making connection decisions.