Southgate

PrimaryNPG33 kV 11 kV 6.6 kV

Location

Loading map...
Coordinates

53.847177, -0.642374

Matched from heatmap
Get Directions

Site Summary

Voltage Levels

3

Best Gen RAG
unknown
Best Gen Headroom

██.█MW

Best Demand Headroom

██.█MW

Operators

NPG

Generation Connection Queue

Embedded Capacity Register + NESO TEC
██ MW
Queued
██ MW
Connected
16
Projects
Unlock the full 16-project queue with a premium subscription

Planned Reinforcement

DNO Network Development Reports
+4 MVA
Total uplift
2033
First completion
1
Schemes
SchemeDriverUpliftIn service
Addition of a second 33/11kV transformer and 33kV circuit, and 11kV switchboard extensionLoad+4.0 MVA2033

Capacity Forecast

Premium
Unlock multi-year capacity forecasts with premium

Voltage Levels (3)

33kV

1 busbar
SOUTHGATE 33 kVNPG
distribution
Gen Headroom

N/A

Demand Headroom

N/A

Fault Level (3ph)

N/A

Firm Capacity

██.█MVA

11kV

1 busbar
SOUTHGATE 11 kVNPGunknown
distribution
Gen Headroom

██.█MW

Demand Headroom

██.█MW

native:npg-site-utilisation

Fault Level (3ph)

██.█kA

Firm Capacity

██.█MVA

6.6kV

1 busbar
SOUTHGATE 6 kVNPG
distribution
Gen Headroom

N/A

Demand Headroom

N/A

Fault Level (3ph)

N/A

Firm Capacity

██.█MVA

Data Source

Primary DNO:Northern Powergrid
License:OGL v3

Data sourced from publicly available DNO datasets. Indicative — verify directly with the DNO before making connection decisions.