Seal Sands Saltholme
PrimaryNPG66 kV
Site Summary
Voltage Levels
2
Best Gen RAG
unknown
Best Gen Headroom
N/A
Best Demand Headroom
N/A
Operators
NPG
Planned Reinforcement
DNO Network Development Reports+20 MVA
Total uplift
2026
First completion
2
Schemes
| Scheme | Driver | Uplift | In service |
|---|---|---|---|
| North Tees - Seal Sands No 1 & 2 66kV cable replacement between Seal Sands 132/66kV and OHL tower P24. Cable specified at 500mm² Cu XLPE with a continuous ducted rating of 78.2MVA. | Asset replacement due to deteriorating condition and performance | +20.2 MVA | 2026 |
| Replacement of 0.6km of 132kV underground cables | Condition | +0.0 MVA | 2027 |
Voltage Levels (2)
66kV
1 busbarSeal Sands (Saltholme) 66 kVNPG
distribution Gen Headroom
N/A
Demand Headroom
N/A
Fault Level (3ph)
N/A
Firm Capacity
N/A
Data Source
Primary DNO:Northern Powergrid
License:OGL v3
Data sourced from publicly available DNO datasets. Indicative — verify directly with the DNO before making connection decisions.