Prescot

BSPSPEN132 kV 33 kV 11 kV

Location

No coordinates available

Site Summary

Voltage Levels

3

Best Gen RAG
unknown
Best Gen Headroom

N/A

Best Demand Headroom

██.█MW

Operators

SPEN

Planned Reinforcement

DNO Network Development Reports
Total uplift
2027
First completion
1
Schemes
SchemeDriverUpliftIn service
New series reactorReinforcement2027

Voltage Levels (3)

132kV

1 busbar
Prescot Grid 132 kVSPEN
distribution
Gen Headroom

N/A

Demand Headroom

██.█MW

native:spen-historic-utilisation

Fault Level (3ph)

██.█kA

Firm Capacity

██.█MVA

Fault Level (1ph)

██.█kA

33kV

1 busbar
Prescot Grid 33 kVSPEN
distribution
Gen Headroom

N/A

Demand Headroom

██.█MW

native:spen-historic-utilisation

Fault Level (3ph)

██.█kA

Firm Capacity

██.█MVA

Fault Level (1ph)

██.█kA

Make Rating

██.█kA

Break Rating

██.█kA

11kV

1 busbar
Prescot Grid 11 kVSPEN
distribution
Gen Headroom

N/A

Demand Headroom

██.█MW

native:spen-historic-utilisation

Fault Level (3ph)

██.█kA

Firm Capacity

██.█MVA

Fault Level (1ph)

██.█kA

Data Source

Primary DNO:SP Energy Networks
Licence:CC BY 4.0

Data sourced from publicly available DNO datasets. Indicative — verify directly with the DNO before making connection decisions.