North Hyde

PrimarySSENNGET66 kV 25 kV 22 kV +1 more

Location

Loading map...
Coordinates

51.499410, -0.409810

From DNO data
Get Directions

Site Summary

Voltage Levels

5

Best Gen RAG
unknown
Best Gen Headroom

██.█MW

Best Demand Headroom

██.█MW

Operators

NGET, SSEN

Generation Connection Queue

Embedded Capacity Register + NESO TEC
██ MW
Queued
██ MW
Connected
3
Projects
Unlock the full 3-project queue with a premium subscription

Planned Reinforcement

DNO Network Development Reports
Total uplift
2037
First completion
2
Schemes
SchemeDriverUpliftIn service
Demand reinforcement at North HydeCapacity2037
Generation reinforcement at North HydeCapacity2037

Voltage Levels (5)

66kV

1 busbar
NORTH HYDE 66 kVSSENunknown
distribution
Gen Headroom

N/A

Demand Headroom

N/A

Fault Level (3ph)

██.█kA

Firm Capacity

██.█MVA

25kV

1 busbar
NORTH HYDE 25 kVSSENunknown
distribution
Gen Headroom

██.█MW

SSEN Headroom Dashboard (March 2026+)

Demand Headroom

██.█MW

SSEN Headroom Dashboard (March 2026+)

Fault Level (3ph)

██.█kA

Firm Capacity

██.█MVA

22kV

1 busbar
NORTH HYDE 22 kVSSEN
distribution
Gen Headroom

N/A

Demand Headroom

N/A

Fault Level (3ph)

N/A

Firm Capacity

N/A

11kV

1 busbar
NORTH HYDE 11 kVSSENunknown
distribution
Gen Headroom

██.█MW

SSEN Headroom Dashboard (March 2026+)

Demand Headroom

██.█MW

SSEN Headroom Dashboard (March 2026+)

Fault Level (3ph)

██.█kA

Firm Capacity

██.█MVA

Voltage unspecified

1 busbar
North HydeNGET
transmission
Gen Headroom

N/A

Demand Headroom

N/A

Fault Level (3ph)

N/A

Firm Capacity

N/A

Data Source

Distribution Operator:Scottish and Southern Electricity Networks
License:OGL v3
Transmission Owner:National Grid Electricity Transmission
License:NESO Open Data Licence (OGL v3.0 based)

Data sourced from publicly available DNO and TSO datasets. Indicative — verify directly with the operators before making connection decisions.