Maybole

PrimarySPENNGET33 kV

Location

Loading map...
Coordinates

55.337023, -4.677002

From DNO data
Get Directions

Site Summary

Voltage Levels

2

Best Gen RAG
unknown
Best Gen Headroom

██.█MW

Best Demand Headroom

██.█MW

Operators

NGET, SPEN

Generation Connection Queue

Embedded Capacity Register + NESO TEC
██ MW
Queued
██ MW
Connected
7
Projects
Unlock the full 7-project queue with a premium subscription

Planned Reinforcement

DNO Network Development Reports
Total uplift
First completion
1
Schemes
SchemeDriverUpliftIn service
The proposed solution is to procure flexible services for Maybole Primary for the RIIO-ED2 period. This solution addresses the prospective network constraints due to the forecast loading and defers the need for conventional network reinforcements until at least the RIIO-ED3 period.Thermal capacity

Voltage Levels (2)

33kV

1 busbar
MAYBOLE GSP 33 kVSPENunknown
distribution
Gen Headroom

██.█MW

native:cim-spen

Demand Headroom

██.█MW

native:cim-spen

Fault Level (3ph)

██.█kA

Firm Capacity

██.█MVA

Voltage unspecified

1 busbar
MayboleNGET
transmission
Gen Headroom

N/A

Demand Headroom

N/A

Fault Level (3ph)

N/A

Firm Capacity

N/A

Data Source

Distribution Operator:SP Energy Networks
License:OGL v3
Transmission Owner:National Grid Electricity Transmission
License:NESO Open Data Licence (OGL v3.0 based)

Data sourced from publicly available DNO and TSO datasets. Indicative — verify directly with the operators before making connection decisions.