Lister Drive
BSPSPENNGET132 kV 33 kV 11 kV +1 more
Generation Connection Queue
Embedded Capacity Register + NESO TEC██ MW
Queued
██ MW
Connected
17
Projects
Planned Reinforcement
DNO Network Development Reports—
Total uplift
2028
First completion
2
Schemes
| Scheme | Driver | Uplift | In service |
|---|---|---|---|
| Replacement of 132kV Switchgear | Modernisation | — | 2028 |
| Install real time thermal monitoring equipment on the 132kV circuit to Burlington Street. Employ Constraint Management Zone (CMZ) based automation scheme to trip the Burlington Street–Bootle circuit and close either line or bus section beaker to supply it from Bootle. Flexibility will be used to reduce dependence on automation scheme, and to manage the utilisation of the whole group throughout the RIIO-ED2 period. | Thermal capacity | — | — |
Voltage Levels (6)
132kV
2 busbars33kV
1 busbar11kV
1 busbarData Source
Distribution Operator:SP Energy Networks
License:OGL v3
Transmission Owner:National Grid Electricity Transmission
License:NESO Open Data Licence (OGL v3.0 based)
Data sourced from publicly available DNO and TSO datasets. Indicative — verify directly with the operators before making connection decisions.