Linton
UnknownNPG
Site Summary
Voltage Levels
1
Best Gen RAG
unknown
Best Gen Headroom
N/A
Best Demand Headroom
N/A
Operators
NPG
Generation Connection Queue
Embedded Capacity Register + NESO TEC██ MW
Queued
██ MW
Connected
2
Projects
Planned Reinforcement
DNO Network Development Reports+21 MVA
Total uplift
2026
First completion
1
Schemes
| Scheme | Driver | Uplift | In service |
|---|---|---|---|
| Linton - Denwick No.2 66kV cable replacement between towers T69 & T70. Cable size specified at 500mm² Cu with a continuous ducted rating of 78.2MVA. | Asset replacement due to deteriorating condition and performance | +20.5 MVA | 2026 |
Voltage Levels (1)
Data Source
Primary DNO:Northern Powergrid
License:OGL v3
Data sourced from publicly available DNO datasets. Indicative — verify directly with the DNO before making connection decisions.