Harrogate
UnknownNPG
Site Summary
Voltage Levels
2
Best Gen RAG
unknown
Best Gen Headroom
N/A
Best Demand Headroom
N/A
Operators
NPG
Planned Reinforcement
DNO Network Development Reports+20 MVA
Total uplift
2026
First completion
1
Schemes
| Scheme | Driver | Uplift | In service |
|---|---|---|---|
| Harrogate - Starbeck 1 & 2 33kV cable replacement (entire route length). Cable specified at 630mm² Cu XLPE with a continuous ducted rating of 42.9MVA per feeder. | Asset replacement due to deteriorating condition and performance | +20.1 MVA | 2026 |
Voltage Levels (2)
Data Source
Primary DNO:Northern Powergrid
License:OGL v3
Data sourced from publicly available DNO datasets. Indicative — verify directly with the DNO before making connection decisions.