Ealing

GSPSSENNGET275 kV 66 kV 22 kV +1 more

Location

Loading map...
Coordinates

51.501340, -0.294540

From DNO data
Get Directions

Site Summary

Voltage Levels

4

Best Gen RAG
unknown
Best Gen Headroom

██.█MW

Best Demand Headroom

██.█MW

Operators

NGET, SSEN

Planned Reinforcement

DNO Network Development Reports
Total uplift
2037
First completion
2
Schemes
SchemeDriverUpliftIn service
Demand reinforcement at EalingCapacity2037
Generation reinforcement at EalingCapacity2037

Voltage Levels (4)

275kV

1 busbar
EalingNGET
transmission
Gen Headroom

N/A

Demand Headroom

N/A

Fault Level (3ph)

██.█kA

min: 18.1 kA

Firm Capacity

N/A

66kV

1 busbar
EALING 66 kVSSENunknown
distribution
Gen Headroom

N/A

Demand Headroom

N/A

Fault Level (3ph)

██.█kA

Firm Capacity

██.█MVA

22kV

1 busbar
EALING 22 kVSSENunknown
distribution
Gen Headroom

██.█MW

SSEN Headroom Dashboard (March 2026+)

Demand Headroom

██.█MW

SSEN Headroom Dashboard (March 2026+)

Fault Level (3ph)

██.█kA

Firm Capacity

██.█MVA

11kV

1 busbar
EALING 11 kVSSENunknown
distribution
Gen Headroom

██.█MW

SSEN Headroom Dashboard (March 2026+)

Demand Headroom

██.█MW

SSEN Headroom Dashboard (March 2026+)

Fault Level (3ph)

██.█kA

Firm Capacity

██.█MVA

Data Source

Distribution Operator:Scottish and Southern Electricity Networks
License:OGL v3
Transmission Owner:National Grid Electricity Transmission
License:NESO Open Data Licence (OGL v3.0 based)

Data sourced from publicly available DNO and TSO datasets. Indicative — verify directly with the operators before making connection decisions.