Deeside Park

BSPSPEN132 kV 33 kV

Location

Loading map...
Coordinates

53.234480, -3.033438

From DNO data
Get Directions

Site Summary

Voltage Levels

2

Best Gen RAG
unknown
Best Gen Headroom

██.█MW

Best Demand Headroom

██.█MW

Operators

SPEN

Planned Reinforcement

DNO Network Development Reports
Total uplift
2028
First completion
1
Schemes
SchemeDriverUpliftIn service
Install new 132/33kV 60MVA grid transformer at Deeside Park and new 132kV bus-section circuit breaker at Connahs Quay to enable reconfiguration of Connahs Quay Grid Supply Point (GSP) to 2+2 supergrid transformer operational arrangement. Swap the Sixth-Avenue grid transformer with RAF Sealand circuit, and set bus-section reactor at Hawarden to normally open. Flexible Services will be procured to manage the network risk during the delivery of the proposed scheme.Thermal capacity2028

Voltage Levels (2)

132kV

1 busbar
Deeside Park 132 kVSPEN
distribution
Gen Headroom

N/A

Demand Headroom

N/A

Fault Level (3ph)

██.█kA

Firm Capacity

N/A

33kV

1 busbar
Deeside Park 33 kVSPENunknown
distribution
Gen Headroom

██.█MW

native:cim-spen

Demand Headroom

██.█MW

native:cim-spen

Fault Level (3ph)

██.█kA

Firm Capacity

██.█MVA

Data Source

Primary DNO:SP Energy Networks
License:OGL v3

Data sourced from publicly available DNO datasets. Indicative — verify directly with the DNO before making connection decisions.