Chester Water Treatment Works
PrimarySPEN33 kV 6.6 kV
Location
No coordinates available
Site Summary
Voltage Levels
2
Best Gen RAG
unknown
Best Gen Headroom
N/A
Best Demand Headroom
N/A
Operators
SPEN
Generation Connection Queue
Embedded Capacity Register + NESO TEC██ MW
Queued
██ MW
Connected
2
Projects
Voltage Levels (2)
33kV
1 busbar6.6kV
1 busbarChester Water Treatment Works 6.6 kVSPEN
distribution Gen Headroom
N/A
Demand Headroom
N/A
Fault Level (3ph)
N/A
Firm Capacity
N/A
Data Source
Primary DNO:SP Energy Networks
License:OGL v3
Data sourced from publicly available DNO datasets. Indicative — verify directly with the DNO before making connection decisions.