Grid connection capacity near SA62

18 substations within 15km of the SA62 postcode district, Pembrokeshire. Compare generation and demand headroom, fault levels and network operator to find viable grid connection sites for solar, wind and battery storage.

SubstationDistanceVoltageDNOGen headroom
Brawdy 11 kV5.5 km11 kVNGED
Brawdy 33 kV5.5 km33 kVNGED
Merlins Bridge 11 kV7.9 km11 kVNGED
Merlins Bridge 33 kV7.9 km33 kVNGED
Withyhedges Landfill 33 kV8 km33 kVNGED
Haverfordwest 132 kV9.4 km132 kVNGED
Haverfordwest 33 kV9.4 km33 kVNGED
Steynton 11 kV12.8 km11 kVNGED
Steynton 33 kV12.8 km33 kVNGED
St Davids 11 kV13.1 km11 kVNGED
St Davids 33 kV13.1 km33 kVNGED
South Hook 132 kV13.5 km132 kVNGED
South Hook 33 kV13.5 km33 kVNGED
Milford Haven 11 kV14.1 km11 kVNGED
Milford Haven 132 kV14.1 km132 kVNGED
Milford Haven 33 kV14.1 km33 kVNGED
Neyland 11 kV15.2 km11 kVNGED
Neyland 33 kV15.2 km33 kVNGED