Grid connection capacity near CF31

20 substations within 15km of the CF31 postcode district, Bridgend. Compare generation and demand headroom, fault levels and network operator to find viable grid connection sites for solar, wind and battery storage.

SubstationDistanceVoltageDNOGen headroom
Bridgend 132 kV1 km132 kVNGED
Bridgend 33 kV1 km33 kVNGED
Llangewydd 11 kV1.4 km11 kVNGED
Llangewydd 33 kV1.4 km33 kVNGED
Litchard 11 kV1.7 km11 kVNGED
Litchard 33 kV1.7 km33 kVNGED
Waterton Industrial 11 kV3 km11 kVNGED
Waterton Industrial 132 kV3 km132 kVNGED
Schwyll 11 kV3.5 km11 kVNGED
Schwyll 33 kV3.5 km33 kVNGED
DOAN 7948071 BRIDGEND, S WALES4.2 km11 kVSSEN
DOAN 79261048 PENCOED TECH PARK5.9 km11 kVSSEN
Cenin Energy Park 33 kV6 km33 kVNGED
Pencoed 11 kV6.1 km11 kVNGED
Pencoed 132 kV6.1 km132 kVNGED
DOAN 7926073 PENCOED TECH PARK6.2 km11 kVSSEN
DOAN 7926075 PENCOED TECH PARK6.2 km11 kVSSEN
DOAN 7926074 PENCOED TECH PARK6.4 km11 kVSSEN
DOAN UNKNOWN6.4 km11 kVSSEN
DOAN 7926072 PENCOED TECH PARK6.4 km11 kVSSEN