Grid connection capacity near TR1
20 substations within 15km of the TR1 postcode district, Cornwall. Compare generation and demand headroom, fault levels and network operator to find viable grid connection sites for solar, wind and battery storage.
| Substation | Distance | Voltage | DNO | Gen headroom |
|---|---|---|---|---|
| Truro Treyew Road | 0.9 km | — | NGED | ██.█ |
| Truro Treyew Road 11 kV | 0.9 km | 11 kV | NGED | ██.█ |
| Truro Treyew Road 33 kV | 0.9 km | 33 kV | NGED | — |
| Truro Shortlanesend | 2 km | — | NGED | ██.█ |
| Truro Shortlanesend 11 kV | 2 km | 11 kV | NGED | ██.█ |
| Truro Shortlanesend 33 kV | 2 km | 33 kV | NGED | — |
| Truro Bsp | 3.2 km | — | NGED | ██.█ |
| Truro BSP 132 kV | 3.2 km | 132 kV | NGED | — |
| Truro BSP 33 kV | 3.2 km | 33 kV | NGED | ██.█ |
| Devoran 11 kV | 5.7 km | 11 kV | NGED | ██.█ |
| Devoran 33 kV | 5.7 km | 33 kV | NGED | — |
| Devoran | 5.7 km | — | NGED | ██.█ |
| Twelveheads 11 kV | 5.9 km | 11 kV | NGED | ██.█ |
| Twelveheads 33 kV | 5.9 km | 33 kV | NGED | — |
| Twelveheads. | 5.9 km | — | NGED | ██.█ |
| Four Burrows Windfarm 33 kV | 6.3 km | 33 kV | NGED | — |
| Four Burrows Blackdown Solar Park 33 kV | 6.8 km | 33 kV | NGED | — |
| Fourburrows Pendown 33 kV | 7 km | 33 kV | NGED | — |
| Probus 11 kV | 7.8 km | 11 kV | NGED | ██.█ |
| Probus 33 | 7.8 km | — | NGED | ██.█ |
Generation headroom and fault levels are blurred on the free plan.Upgrade to Pro