Grid connection capacity near CH8

20 substations within 15km of the CH8 postcode district, Denbighshire. Compare generation and demand headroom, fault levels and network operator to find viable grid connection sites for solar, wind and battery storage.

SubstationDistanceVoltageDNOGen headroom
Holway Road 11 kV1.3 km11 kVSPEN
Holway Road 33 kV1.3 km33 kVSPEN
Greenfield 11 kV3 km11 kVSPEN
Greenfield 33 kV3 km33 kVSPEN
Holywell 11 kV3.5 km11 kVSPEN██.█
Holywell 132 kV3.5 km132 kVSPEN
Holywell 33 kV3.5 km33 kVSPEN
Wimpeys Pant Quarry 11 kV7 km11 kVSPEN
Wimpeys Pant Quarry 33 kV7 km33 kVSPEN
Flint 11 kV7.6 km11 kVSPEN
Flint 33 kV7.6 km33 kVSPEN
Point Of Ayr Colliery 11 kV7.8 km11 kVSPEN██.█
Point Of Ayr Colliery 33 kV7.8 km33 kVSPEN
Caldy 11 kV9.9 km11 kVSPEN
Caldy 33 kV9.9 km33 kVSPEN
West Kirby South 11 kV10.2 km11 kVSPEN
West Kirby South 33 kV10.2 km33 kVSPEN
North Wales Paper 11 kV10.4 km11 kVSPEN
North Wales Paper 33 kV10.4 km33 kVSPEN
Nant Hall 11 kV11 km11 kVSPEN
Generation headroom and fault levels are blurred on the free plan.Upgrade to Pro