MVEE
PrimarySSEN11 kV
Network Hierarchy
CurrentMVEE
BSPBRACKNELL
GSPFLEET BRAMLEY
Headroom may be constrained by upstream infrastructure (BSP/GSP)
Network Constraints
Constraint Details
- Upstream constrained
- No headroom on 33kV circuits, reinforcement required Fleet & Bramley GSP group to be split and a new 132kV switchboard installed at Bramley (Jul 2030)
- BSP 33kV CBs close to fault rating
Upstream TX Queue N/A
contracted generationat upstream GSP
High queue indicates significant generation already contracted at this connection point.
Nearby Substations
Data Source
Data sourced from publicly available DNO datasets. This data is indicative and should be verified directly with the DNO before making connection decisions.